LightShine Base – Water & Electric – 2021

May 15 – May 31, 2021

Water System Team: Led by Mel Miller – May 15 – May 31

Two BIG weeks of work. Building a water house, digging footers and pouring concrete floor for the water house, digging trenches from water shed to garage and cook shack, install water tank, water pump, insulate water house, and rough in plumbing in the garage. The septic system will also be installed during this time by a local contractor.

Week 1 – May 15-23 – Carpenters are needed to pour a footer, build and insulate a 10’x12′ water house. During this first week, there will be a lot going on with trenches being dug, pipe being laid

Week 2 – May 22-31 – Plumbers and Electricians are needed to connect the water and electrical systems to the bunkhouse.

NOTE: Both of these teams will be working towards connecting our Bunkhouse/Garage (above) with water, electric and septic systems. Expect to be sleeping in your sleeping bag on a cot and using our beautiful outhouse. We do have a shower available that is in an enclosed room with warm water. Some would consider this “roughing it”. Ask your team leader what to expect.

Electrical Team: Led by Steve Hoey – May 15 – May 31

The electrical team will be digging a trench from the pole to the water house, cook shack and garage, installing electrical panels, and installing outlets & switches in the garage.
His wife Reneė will also be on this team helping with cooking and various other jobs. We encourage couples to consider being part of this team.
Below is an overview of the septic, electrical and water lines at the property.