Base Team 3 – 2025

July 11 – 20

What an amazing week this team had!

This team worked so hard. An earlier team (Base Team 2) built the foundation for this building (pictured here) so that when these guys arrived, the pad was ready for building on. Although we faced several challenges during the week, we saw the LORD bless us in so many ways. It was the perfect culmination of His plan being unfolded after He abundantly blessed us with the funds to purchase the building materials and rental of vitally needed equipment to complete the job. The weather was absolutely perfect in the mid 60s – low 70s with no rain! God is so good. 

This slideshow requires JavaScript.

Thank you for giving towards this project. This new garage will be a vital part of our missions base.

We still need to get garage doors before winter. We will be releasing a video on that need soon.

Gary Zimmerman led this team from Pennsylvania and worked with Bob & Angie Neuenschwander who are living at the base. Contact Gary with any questions that you might have about serving next year. We need to build a team for 2026 that installs half round wood siding and a 3′ high stone around the base of the exterior walls. Call him at 717-951-5001 or email him at: garyz@ebersolebuilders.com

You can be part of a team like this!

“Eye has not seen, nor ear heard, nor have entered into the heart of man, the things which God has prepared for those who love Him.” 1 Corinthians 2:9

Thank you for considering going with us in 2026!